We developed both the technical drawing and a BIM model – to supply to the architects and MEP specialists – that would serve as a 100% reliable basis for clash detection. An important consideration in projects of such a complex nature is that we work closely with the client.
It was essential for us to fully understand our client’s products, become part of their team, and embrace how the flooring system is installed. In understanding each component’s fundamental ‘rules’, we produced a life-like model that could be used for clash detection, extracting fit-out drawings, and function as a trustworthy, reliable source of information and guidance at handover.